Updated 17 November 2026: first published, on Implementing Regulations (EU) 2025/2547 and 2025/2621 as replaced by 2026/1740.
From 2026, an EU importer of cement, iron and steel, aluminium, fertilisers or hydrogen declares the emissions embedded in each good. Without the installation's actual figure, the importer uses the EU default value with a mark-up, which usually costs more. The Indian producer works out the actual figure, its verifier checks it, and it goes to the buyer. The free CBAM embedded emissions worksheet works it out for one good and passes it to the CBAM cost estimate. No sign-up, and nothing you type is saved to an account or our database; if you send the result on to the cost estimate, the figures pass to it in this browser tab only, once.
The method
Implementing Regulation (EU) 2025/2547, Annex III B, Equations 59 to 62:
- Own direct emissions per tonne = the direct emissions your monitoring plan attributes to this good's process in the period / the tonnes produced.
- Own indirect emissions per tonne = electricity used (MWh) x the emission factor / the tonnes produced. In India the factor is the EU default, 0.726 tCO2 per MWh (Implementing Regulation (EU) 2025/2621, Annex II), unless an actual factor is allowed: a direct technical link, or a power purchase agreement that meets the conditions of Implementing Regulation (EU) 2025/2547, Annex II D.4.3, which your verifier checks. The CEA grid factor is not an option.
- Each precursor adds its tonnes per tonne of good x its own SEE, direct to direct and indirect to indirect. A precursor from the EU or an exempt country counts at zero. An Annex II precursor (iron, steel, aluminium, hydrogen) never adds its indirect emissions.
- SEE is stated to 5 decimals.
For the CBAM cost, iron and steel, aluminium and hydrogen count direct emissions only; cement and fertilisers count direct and indirect (Regulation (EU) 2023/956, Annex II).
Precursors at default values
Where a precursor's supplier gives no verified actual figure, you use its EU default value. The default carries the mark-up for the year the good is produced: 10% in 2026, 20% in 2027, 30% from 2028, and 1% for fertilisers (Implementing Regulation (EU) 2025/2621, Article 1(2) and Annexes I and IV, as replaced by Implementing Regulation (EU) 2026/1740; Commission Guidance No. 3). The Regulation sets the mark-up on the default value's total; the direct and indirect columns of the table are for information. The worksheet starts from the total you enter and raises it by the mark-up. It then splits it between direct and indirect in the proportion of the two columns: that split is the worksheet's approximation, not one the acts prescribe, so have it checked. For an iron, steel, aluminium or hydrogen precursor, whose indirect emissions never count, the whole total is taken as its direct figure, which may overstate it. A precursor whose country of production cannot be identified takes Annex IV's highest values (Article 1(5)); the worksheet does not take it. It also shows the share of your SEE that comes from default values, which the operator's report states.
A worked example
Portland cement, 2026: 100,000 tonnes produced; 4,200 tCO2e of direct emissions attributed to grinding and drying; 9,500 MWh of electricity at the EU default; 0.72 tonnes of clinker per tonne, from the company's own kiln, with an actual SEE of 0.85 direct and 0.03 indirect.
- SEE direct = 4,200 / 1,00,000 + 0.72 x 0.85 = 0.042 + 0.612 = 0.65400 tCO2e per tonne.
- SEE indirect = 9,500 x 0.726 / 1,00,000 + 0.72 x 0.03 = 0.06897 + 0.0216 = 0.09057 tCO2e per tonne.
- Counted for the CBAM cost (cement: both) = 0.74457 tCO2e per tonne; per tonne of clinker, 0.90833 direct and 0.12579 indirect.
What the worksheet leaves out
It takes the direct emissions already attributed to the good: attributing an installation's emissions, measurable heat and waste gases between goods is the monitoring plan's work. And it is an estimate for professional review: the buyer can declare actual emissions only once a verifier accredited under the EU CBAM rules has checked them.
The worksheet runs on the code behind CarbonNeeti's CBAM screen, with one difference: the product's screen does not yet add the mark-up to a precursor entered at its default value. In the product, each quarter's figures are recorded with their evidence and go into the communication your buyer needs.