An absolute emissions figure grows with the company. An intensity divides it by what the company produces or earns, so it can be compared year on year and with peers. BRSR asks for three, and BRSR Core puts two of them under assessment or assurance. The free emissions intensity calculator works them out and labels each with what it divides. No sign-up, and nothing you type is saved to an account or our database.
The numerator
Scope 1 + Scope 2, in tCO2e. That is the figure BRSR Principle 6, Essential Indicator 7 and BRSR Core Attribute 1 divide. Scope 2 is location-based. Scope 3 is not in it. BRSR asks for Scope 3 and its intensity separately, under the Principle 6 leadership indicators; the calculator's Scope 1 + 2 + 3 lines are neither that figure nor the Essential Indicator 7 figure, and sit on their own lines.
The denominators
- Per rupee of turnover: revenue from operations for the year. This is one figure for the whole company and the full financial year, so a site or business unit has no per-rupee intensity.
- Per million US$ adjusted for PPP: revenue from operations divided by the IMF's purchasing power parity rate for India, for the calendar year the financial year ends in (SEBI's Industry Standards Note on BRSR Core), then by one million.
- In terms of physical output: the year's output in its unit, such as tonnes of cement. Services companies divide by full-time equivalents instead, as the Industry Standards Note asks.
Each ratio is rounded to seven significant figures, as CarbonNeeti's BRSR report and its XBRL file state it.
A worked example
A cement company, FY 2025-26, whole company:
- Scope 1: 41,250.5 tCO2e; Scope 2: 18,310.25 tCO2e; total 59,560.75 tCO2e.
- Revenue from operations: Rs 1,250 crore (Rs 12,500,000,000).
- Output: 12,50,000 tonnes of cement.
| Intensity | Figure | Unit |
|---|---|---|
| Per rupee of turnover | 0.00000476486 | tCO2e per rupee (47.65 per crore) |
| Per million US$ (PPP), IMF rate 20.024 for 2026 | 95.41156 | tCO2e per million US$ (PPP) |
| In terms of physical output | 0.0476486 | tCO2e per tonne of cement |
The PPP step: Rs 12,500,000,000 / 20.024 = 624.2509 million international dollars; 59,560.75 / 624.2509 = 95.41156.
What it is not
It is not the CCTS GHG emission intensity. CCTS divides by the equivalent product in the plant's notified target, on its own boundary and with AR5 global warming potentials; the CCTS target calculator works that one out. Nor does a figure from a calculator make a disclosure BRSR or CCTS compliant: your assurance provider checks the emissions and the denominator behind it.
The arithmetic is the one CarbonNeeti's BRSR engine uses. In the product, the figures come from your approved readings and declared revenue, with the previous year beside them.