Updated 16 November 2026: first published; every factor and example checked against the factor table the free calculator uses.
Scope 1 is what your own site burns or releases: coal in a boiler, pet coke in a kiln, diesel in a generator, gas in a furnace. For most Indian plants, fuel is the largest part of Scope 1, and the part this guide covers.
You can work it out by hand with the steps below, or use the free Scope 1 fuel calculator. It takes coal by grade, diesel, pet coke, LPG, natural gas and furnace oil in the units you buy them, and shows the NCV and factor it used. No sign-up, and nothing you type is saved to an account or our database.
Who needs the figure
- Listed companies filing a BRSR. Principle 6 asks for Scope 1, including CH4 and N2O.
- Plants with a CCTS target. Fuel CO2 is part of the plant's GHG emission intensity. CCTS counts CO2 and PFCs only (BEE Detailed Procedure s.4.2(1)), so CH4 and N2O are left out there.
- Anyone preparing a GHG Protocol inventory or a customer's supplier questionnaire.
The method
- Convert the invoice unit to the factor's unit. Litres and kilolitres become tonnes at the conversion factor PPAC publishes (Snapshot of India's Oil and Gas data, August 2026, Table 27): 1 tonne of HSD is 1.210 kL, 1 tonne of furnace oil is 1.0424 kL. Gas billed in SCM (15 degC) becomes Nm3 (0 degC): 1 SCM = 273.15 / 288.15 Nm3.
- Multiply by the net calorific value (NCV) to get the energy in GJ. For coal, use the NCV on your test certificate. If it gives only the GCV, BEE's Detailed Procedure s.5(9)(iii) takes the NCV as 95% of the GCV. If you know only the grade, the middle of the grade's GCV band is a fair stand-in. With no test data, use India's national default of 19.6 GJ per tonne.
- Multiply the energy by the carbon factor (kg CO2 per GJ, IPCC 2006) and by the oxidation factor (1.0 at IPCC Tier 1). That is the CO2.
- Add CH4 and N2O at the IPCC 2006 Volume 2 Tier 1 defaults for your industry's category, at AR6 global warming potentials.
The default factors behind step 3:
| Fuel | NCV | kg CO2 per GJ | t CO2 per unit |
|---|---|---|---|
| Indian coal (non-coking) | 19.6 GJ/t (India NATCOM) | 96.1 | 1.88356 per tonne |
| Diesel (HSD) | 43.0 GJ/t | 74.1 | 3.1863 per tonne |
| Pet coke | 32.5 GJ/t | 97.5 | 3.16875 per tonne |
| LPG | 47.3 GJ/t | 63.1 | 2.98463 per tonne |
| Furnace oil | 40.4 GJ/t | 77.4 | 3.12696 per tonne |
| Natural gas | 36.0 GJ per 1,000 Nm3 | 56.1 | 2.0196 per 1,000 Nm3 |
One caution on natural gas. IPCC gives its NCV per tonne only (48.0 GJ/t). The 36.0 GJ per 1,000 Nm3 assumes a density of 0.75 kg/Nm3, a typical figure for lean pipeline gas that no IPCC table gives. If your gas bill states the calorific value, enter it on the reading in CarbonNeeti, which converts a GCV per SCM or Nm3 to the NCV it prices with; the free tool uses the default.
Worked example: 500 tonnes of Indian coal
A plant burns 500 tonnes of non-coking Indian coal in FY 2025-26.
At the national default:
- Energy: 500 x 19.6 = 9,800 GJ
- CO2: 9,800 x 96.1 / 1,000 = 941.78 tCO2
- With CH4 and N2O for a manufacturing plant (IPCC Table 2.3): 948.44 tCO2e
At grade G11. The Ministry of Coal's G11 band covers a GCV above 4,000 and up to 4,300 kCal/kg. The middle is 4,150. At 95%, the NCV is 3,942.5 kCal/kg. The same 500 tonnes then come to 798.74 tCO2e, which is 149.70 less than the default figure. G11 coal carries less energy per tonne than the national default assumes, so the default overstates its emissions. Your own test certificate beats both.
Worked example: 20,000 litres of diesel
- 20,000 litres = 20 kL; 20 / 1.210 = 16.528926 tonnes
- With CH4 and N2O: 16.528926 x 3.1968264 = 52.84 tCO2e
- CO2 only: 16.528926 x 3.1863 = 52.67 tCO2
The calculator returns these figures for other fuels, all for a manufacturing plant in FY 2025-26:
| You enter | Priced as | tCO2e |
|---|---|---|
| 50 tonnes of pet coke | 50 tonnes | 158.84 |
| 1,00,000 SCM of natural gas | 94.794378 thousand Nm3 | 191.63 |
| 2,000 kg of LPG | 2 tonnes | 5.97 |
| 30 kL of furnace oil | 28.779739 tonnes | 90.28 |
Each is the figure CarbonNeeti stores for the same reading: the same factor table, unit conversion and rounding.
Run the Scope 1 calculator on your own fuel.
The CCTS figure counts less
CCTS counts CO2 and PFCs. For the 500 tonnes of coal, that is 941.78 tCO2, not 948.44. Use the CO2 part for a CCTS report and the full figure for BRSR and your inventory. The CCTS target gap guide shows how the CO2 figure turns into a credit position.
What the figure leaves out
- Process emissions. Calcination in a cement kiln releases CO2 that no fuel calculation catches: 0.52 tCO2 per tonne of clinker at the IPCC 2006 Tier 1 default. Our guide to calculating emission intensity covers it.
- Fugitive emissions, such as refrigerant leaks.
- Vehicles. The calculator covers fuel burnt in stationary plant. Diesel in road vehicles carries different CH4 and N2O factors, which the emission factor lookup lists.
- Biomass. Its CO2 is biogenic and reported apart from the scopes. Its CH4 and N2O are Scope 1.
- Electricity you buy. That is Scope 2: see the Scope 2 method.
For every factor and where it comes from, see our emission factors reference and Scope 1 vs Scope 2 emissions.
Where CarbonNeeti fits
CarbonNeeti prices every fuel at every plant, uses your own lab NCV, and builds the GHG and BRSR figures from the same readings. We prepare. You file.