CCTS Target Gap: How to Work Out Whether a Plant Earns or Owes Credits

Find a plant's CCTS target, work out its GEI, and estimate the carbon credit certificates it could be issued or must surrender, with a worked cement example.

By the CarbonNeeti teamPublished 5 min read

Share

Updated 16 November 2026: first published; schedules as transcribed from the gazettes on 13 November 2026.

Under India's Carbon Credit Trading Scheme (CCTS), each obligated plant has a target for its greenhouse gas emission intensity (GEI) in FY 2025-26 and FY 2026-27. Beat the target and the plant can be issued carbon credit certificates for the difference. Miss it and the plant must surrender certificates to cover the gap.

This guide shows the arithmetic. The free CCTS target lookup and gap calculator does it for you: search a plant by name or registration number, see its baseline and targets, and enter output and emissions to see the gap. No sign-up, and nothing you type is saved to an account or our database.

Who needs the figure

The plants named in the schedules of the Greenhouse Gases Emission Intensity Target Rules, 2025:

  • G.S.R. 739(E) of 08/10/2025 notified aluminium, cement, chlor-alkali and pulp and paper plants.
  • G.S.R. 25(E) of 13/01/2026 notified petrochemical, petroleum refinery and textile plants, and more aluminium plants. G.S.R. 794(E) of 07/09/2026 substituted its refinery and textile tables.
  • G.S.R. 517(E) of 26/06/2026 is a draft for 255 iron and steel units. Its figures are proposed and not binding yet.

Together the two notified schedules cover 490 entities in 7 sectors. The obligated entity list guide has the counts by sector. Plant heads use the gap to plan abatement; finance teams use it to budget for certificates.

The method

  1. Find the plant's row. The schedule gives its registration number, its FY 2023-24 baseline output and GEI, and its target GEI for each compliance year.
  2. Work out the achieved GEI. GEI = GHG emissions on the CCTS boundary (tCO2e) / equivalent output in the year. CarbonNeeti rounds it half up to six decimals; that is its method, not a rounding rule BEE prints, so the calculator also shows the unrounded gap. The boundary counts CO2 and PFCs inside the plant, plus purchased electricity at the FY 2023-24 grid factor of 0.727 tCO2/MWh and purchased heat, minus what the plant exports. CCTS uses IPCC AR5 global warming potentials, where a GHG inventory uses AR6.
  3. Work out the gap. Gap = (target GEI - achieved GEI) x output, rounded to six decimals.
  4. Read the sign. Above zero, the plant would be eligible to be issued that many certificates, after verification and the Bureau of Energy Efficiency's process. Below zero, it would need to surrender that many. One certificate is one tonne of CO2e.

The output is the sector's equivalent product, not simply tonnes dispatched. Our guide to calculating emission intensity explains the boundary and the equivalent product for each sector.

Worked example: an integrated cement plant

Take an integrated cement plant whose schedule row reads as below. The plant and every figure in this example are invented to show the arithmetic; look up your own plant's row in the calculator.

ItemValue
Baseline output, FY 2023-2436,75,964 tonnes
Baseline GEI, FY 2023-240.5024 tCO2e/tonne
Target GEI, FY 2025-260.4991 tCO2e/tonne
Target GEI, FY 2026-270.4903 tCO2e/tonne

Suppose that in FY 2025-26 the plant makes 36,00,000 tonnes of equivalent cement and emits 18,10,000 tCO2e on the CCTS boundary.

  • GEI = 18,10,000 / 36,00,000 = 0.502778 tCO2e/tonne
  • Gap = (0.4991 - 0.502778) x 36,00,000 = -0.003678 x 36,00,000 = -13,240.80 tCO2e

The gap is negative, so on CarbonNeeti's estimate the plant would need to surrender certificates for about 13,240.80 tCO2e. The GEI is rounded to six decimals before it is multiplied, as CarbonNeeti's calculation does; unrounded, the gap would be 13,240.00 tCO2e. The final position follows BEE's own rules, including its rounding, and needs verification by an accredited carbon verification agency (ACVA). To meet the target at that output, its emissions would have to stay at or below 0.4991 x 36,00,000 = 17,96,760 tCO2e.

Now hold the same GEI into FY 2026-27, when the target drops to 0.4903:

  • Gap = (0.4903 - 0.502778) x 36,00,000 = -0.012478 x 36,00,000 = -44,920.80 tCO2e

The target tightens, so a flat GEI owes more than three times as much in the second year.

The other direction: if the plant emitted 17,80,000 tCO2e in FY 2025-26, its GEI would be 0.494444. The gap is (0.4991 - 0.494444) x 36,00,000 = 0.004656 x 36,00,000 = +16,761.60 tCO2e, which it would be eligible to be issued.

The calculator uses the same function CarbonNeeti uses for a plant's credit position, so the two round the same way. Look up your plant and estimate its gap.

What the estimate leaves out

  • Whether your emissions are on the CCTS boundary. The Scope 1 fuel calculator includes CH4 and N2O, which CCTS does not count, so use the CO2 part of its figure. Price purchased electricity at 0.727, not the reporting year's factor (see the Scope 2 method).
  • A money figure. The calculator gives tonnes, not rupees. Our posts on the carbon credit price and surplus or deficit planning cover how to plan for a range of prices.
  • Verification. A Verifier (an accredited carbon verification agency) checks the reported GEI before any certificate is issued or surrendered.
  • Missing a target. What follows a shortfall is covered in our guide to CCTS penalties.

Where CarbonNeeti fits

CarbonNeeti works out GEI from your monthly readings on the CCTS boundary and prepares the Form A for your Verifier. You file it.

Share

We prepare. You file. This is general information, not legal advice; check the cited source.

Free for 30 days. No credit card.

Try CarbonNeeti on your own bills.

Found something wrong or out of date in this post?Tell us what we got wrongAll posts